Tramnak · Project films
Our work.In motion.
From hands-on site work to the details of a finished interior. Take a closer look at five Tramnak projects and the work behind them.
Choose a film to watch.
Having trouble? Open the film directly.
Grantully Road
A closer look at the façade.
High above Grantully Road, this film follows work to a mansion block’s brick façade and decorative upper detailing. Close-up views of the team at work sit alongside wider shots of the scaffolded elevation, showing the scale of the building and the care its exterior demands.
From exposed brickwork to the shaped architectural features around the roofline, the footage offers a look at the preparation and hands-on work behind an exterior refurbishment.
- Façade work
- Brickwork
- Exterior detailing
Having trouble? Open the film directly.
Horton Street
The details that bring a room together.
A look inside the Horton Street project, from work in progress to views of the interior finishes. Timber flooring, white-painted joinery and bathroom details give the film its focus, with the team shown working through the practical tasks behind the finished rooms.
The sequence moves between close-up workmanship and wider interior views, bringing attention to the surfaces and details that shape how a home looks and feels.
- Interior finishes
- Flooring
- Joinery
Having trouble? Open the film directly.
St Ann’s Terrace
Care for the character of a building.
At St Ann’s Terrace, the camera moves from the scaffolded street elevation to the team preparing and repairing exterior surfaces. Window surrounds and decorative features come into focus, showing the close attention involved in working on a detailed façade.
This is a view of the work beneath the final finish: removing loose material, preparing the background and working around the building’s existing architectural details.
- Surface preparation
- Façade repairs
- Decorative details
Having trouble? Open the film directly.
Tranton Road
Before the finishing touches.
This short film goes behind the finished surfaces at Tranton Road. Opened-up areas, exposed ceiling timbers, wall preparation and floor work show a property during the practical stages of refurbishment.
With the team at work throughout, the footage captures the less visible side of a renovation: taking back existing finishes and preparing the space for the next stage.
- Preparation
- Floor work
- Work in progress
Having trouble? Open the film directly.
Barness Court
From room to room, a sense of home.
Step inside Barness Court for a walkthrough of the interiors. The film moves through circulation spaces and bathrooms to the living areas, with views of fitted storage, timber flooring, decorative lighting and the details around doors and ceilings.
Seeing the rooms in sequence gives a fuller impression of the property than a single photograph, drawing attention to the way finishes and features connect from one space to the next.
- Interior walkthrough
- Bathrooms
- Finishing details
